Conceptual drawings have been developed to help you envision the new
campus on Old State Road; both the projects that will be completed in
the 2009 Referendum (Phase One) and those that will be added at a future
date as enrollment continues to climb and more schools are needed (Phase
Two).
Phase Two of the site's development would be addressed by a separate
referendum tentatively scheduled for 2012/13. Included at that time
would be a request to develop a middle school, a high school, an
aquatics center (currently we have no pools for our swim teams) and an
environmental center. The last two buildings would be used by ALL our
students and offer access to the public as well. If funded in the
2012/13 Referendum, we estimate Phase Two Projects would be completed by
2015.
Note: Addition/renovation projects at Olive B. Loss Elementary, Townsend
Elementary, the Appoquinimink Early Childhood Center Kitchen, and the
Everett Meredith Middle Auditorium will be designed to complement each
building's existing design and architecture and blend seamlessly with
the community.
PHASE ONE: 2009 Referendum
Site Location
Detailed site plan - Phase I
Entrance
Campus Green
Elementary School
Outdoor Classroom
PHASE TWO: 2012/13 Referendum*
Artist's rendering of the completed campus
Detailed site plan - Phase II
Environmental Education Center
Trails
Aquatic Center
*Estimated date
|