Conceptual drawings have been developed to help you envision the new campus on Old State Road; both the projects that will be completed in the 2009 Referendum (Phase One) and those that will be added at a future date as enrollment continues to climb and more schools are needed (Phase Two).

Phase Two of the site's development would be addressed by a separate referendum tentatively scheduled for 2012/13. Included at that time would be a request to develop a middle school, a high school, an aquatics center (currently we have no pools for our swim teams) and an environmental center. The last two buildings would be used by ALL our students and offer access to the public as well. If funded in the 2012/13 Referendum, we estimate Phase Two Projects would be completed by 2015.

Note: Addition/renovation projects at Olive B. Loss Elementary, Townsend Elementary, the Appoquinimink Early Childhood Center Kitchen, and the Everett Meredith Middle Auditorium will be designed to complement each building's existing design and architecture and blend seamlessly with the community.

PHASE ONE: 2009 Referendum

Site Location
Detailed site plan - Phase I
Entrance
Campus Green
Elementary School
Outdoor Classroom

PHASE TWO: 2012/13 Referendum*

Artist's rendering of the completed campus
Detailed site plan - Phase II
Environmental Education Center
Trails
Aquatic Center

*Estimated date